The ASEC plant was commissioned to the port of Huelva on May 2024.
Picture. Pilot plant transportation and installation in the Port of Huelva. Picture. Water Challenge team after ASEC system commissioned to the Port of Huelva. Picture. Working ASEC technology at the Port of Huelva for dredged material depuration.
Screening depuration tests of dredged materials
Picture. On the left, the dredged material collected sample, and the fluid (distilled water) after the ASEC treatment. On the right the dried solid sample collected after the dredged material depuration.
Participation of Water Challenge in the I National Congress of Hydrogen (I Congreso Nacional de Hidrógeno) celebrated in Huelva betweenon 7th and 9th of February 2024
Agreement between Water Challenge S.L. and the Authorities of the Port of Huelva for the location of the ASEC pilot plant.
Visit of Water Challenge team to the port of Huelva on 8th June 2023.
In this opportunity, a meeting with the Authorities of the port to concrete details for the next steps, and a field visit to the potential emplacement of the pilot plant in the port of Huelva had place.
Participation of Water Challenge in the II Jornadas de Sostenibilidad Ambiental y Gestión Portuaria (II Environmental Sustainability and Port Management Conferences) celebrated in Huelva during 27 and 28th of September 2023.
The CEO presented the ASEC project in the framework of the EIC Accelerator program, objectives, current advances, and expected results. But also, the CEO Susana García participated in a round table discussing about dredged materials, sustainability and the role of the enterprises in the environmentally sustainable management.